INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Built-up Beam ply-ply connection

Built-up Beam ply-ply connection

Built-up Beam ply-ply connection

(OP)
I've got an LVL (3-ply) supporting a large concentrated load...12,000# hanging into the side.  The hanger will be a simpson hanger so no issues with that.  I need to figure out the best way to connect the plies together of the supporting beam.  Don't think the typical connection is sufficient.  I've read through Breyer's book and don't believe he addresses this, I've also checked the NDS and they're fairly vague as well.  What I'm pretty sure I need to do is be able to transfer, in single shear, 2/3 of the 12,000#.  (1st ply will carry 1/3, the rear 2 plies the remaining).  I come up with a lot of bolts.  What's the best way to orient these bolts to reduce group action factor.  Thanks.   

RE: Built-up Beam ply-ply connection

Jon:
The hanger maybe by Simpson, but it's probably not one of their off the shelf stds.  Look at their Glulam hangers, top flange hung or top flange saddle hangers; GLS/HGLS/GLT/HGLT, or something along that line.  I would still want some bolts through all the members.  The top flange saddle distributes part of the load to the 3-LVL's, but some bolts through the LVL's distributes some and ties the three together.  Otherwise, your 1/3,1/3,1/3 is about right; but you have to transmit 1/3 to the first LVL and 2/3 through the first, some distance, etc.  They should be able to size the top flange saddle to fit your 3-LVL's in width, and the side plate or pates to fit their depth.

RE: Built-up Beam ply-ply connection

You might try screws i.e. simpson 1/4 SDS.  They don't get adjusted with the group action factor.  AT 4000# per ply that works out to about 17 screws per ply.  They can be installed from both sides with location offset.

RE: Built-up Beam ply-ply connection

(OP)
Thanks for the responses.  There is no available top flange hanger per simpson.  We have to use a face mount.  

Will probably use simpson screws for the connection. Hadn't thought of that.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources