INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Synchronous generator short-circuit

Synchronous generator short-circuit

Synchronous generator short-circuit

(OP)
Hi everybody

I have a question regarding synchronous generator terminal short-circuit. When the generator operates at full torque, and there is a short-circuit in generator terminals, torque starts to oscillate from positive to negative and back (and also starts to dampen). What about the direction of the first torque peak, which has the highest amplitude.. Is it always in the same direction as the rated operating torque, or is it in the opposite direction? If it is in the same direction as rated torque, it means that the first peak would have to be added on top of the rated torque, second option would mean that the first peak would have to be extracted from rated torque to get the total torque on the shaft.

Could someone explain which one is correct? I hope I was clear enough.

Thanks.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources