INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Building geometry screening per ASCE 31-03 section 4.3.2.3

Building geometry screening per ASCE 31-03 section 4.3.2.3

Building geometry screening per ASCE 31-03 section 4.3.2.3

(OP)
I'd like to get a second opinion from guys who've done seismic evaluations of existing buildings before.

I'm working on a 4-story building with 1 level of basement. It's a type S4 building. The basement level footprint is wider at 4 sides to the typical floor footprint of the building (offset at 4 sides from the basement retaining walls). The 4 sides of the basement are concrete retaining walls, which also serve as additional shear walls for the 1st floor level, triggering the geometry non-compliance rating. The rest of the concrete shear walls (within the typical floor footprint) are full height to the roof and do not change at all.

To avoid triggering a non-compliant rating for building geometry (either tier 1 or 2), am I allowed to ignore the retaining walls at the perimeter of the basement if I can show that the remaining shear walls are adequate for the pseudo lateral force?

I'm trying to avoid doing the lengthy Linear Dynamic Procedure for Tier 2 screening. This building is located in Phoenix, AZ (we have a very low earthquake probability) but rated moderate per 31-03 and working on Life Safety performance level. thanks!
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources