INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

IBC pile question

IBC pile question

IBC pile question

(OP)
Section 1810.3.1.3 of the 2009 IBC requires that the foundation be designed to resist the effects of mislocation of any deep foundation element by 3".  This is easily achieved in the design of the cap).... However, how is it accounted for in the design of the piles under the cap (it does allow you to use 110% of the pile capacity in this instance)?  

Does this mean that I have to design the pile group for the moment = (the column reaction) x (3 inches)?  Or is the 3" accounted for in the geotechnical design of the piles (with a reduced allowable capacity)?
 

RE: IBC pile question

In my view if 3" deviation is allowed, it is allowed and no excursion of the loading needs to be made; however since subject to opinion you or the revising party might want to go more conservative and proceed for everything with an excursion of the load to the allowed limits at least; that shouldn't be unreasonable.

To minimize effects on the pile design the best thing would be to make a 3D model with displaced pile and soil and then see how the soil effectively coerces the pile as to produce an almost unchanged state respect the perfectly placed pile case; it may also be helpful to assign proper reinforcement to the piles.

RE: IBC pile question

(OP)
ishvaaag,

The design of the caps is the simple part.  All I need to do is account for the additional moment (and possibly shear ) when I design the cap.  In fact, I believe the CRSI (the standard go to book in the US for concrete design charts) accounts for the 3" eccentricity in the design of the cap.  However, if you had to account for the eccentricity by moving the load then none of these charts would be acceptable as they deal with vertical load only with no eccentricity.  Accounting for moment in a cap is simple but extremely tedious.

I guess I am just getting a little confused.

RE: IBC pile question

Based on previous experience, I have always received as-builts of piles and then run them really quick in my analysis program to account for the additional loads in the pile due to eccentricity.

More often than not, I have used RAM Concept to get pile loads and it gives me the option to move every pile in a pile cap relative to its original configuration.

Alternatively, you can set up a spreadsheet that does this for you.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.