INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

As-built piles stresses

As-built piles stresses

As-built piles stresses

(OP)
Is there a standard practice to allow for an overstress in a pile in the as-built state.  I have a bunch of wooden piles that are out of tolerance.  Upon analysis, some of the piles are overstressed by less than 10%.  I have been told that it is common to allow this tolerance for a pile group in the as built condition.  I am wondering if this is common or not.

RE: As-built piles stresses

How good are the assumptions that led you to the overstress conclusion?  Do you have load test data or just driving data.  Depending on the type of soil conditions, piles can gain load resistance with time, particularly in marls and similar soils.

RE: As-built piles stresses

Are the piles overstressed in combined axial and bending capacity or in soil resistance?

BA

RE: As-built piles stresses

(OP)
In going through the numbers it was brought to my attention that according to the building code a 10% overstress in the as-built pile locations is acceptable.  This building code is a jurisdiction version of IBC 2003.  A similar number can be seen in IBC 2009 1810.3.1.3 but the jurisdiction version is a little more specific when it comes to field mislocation.

RE: As-built piles stresses

The piling code I use allows 75mm tolerance. When designing a pile cap I make my designs based on the assumed pile location plus the adverse effect of a pile being out of position 75mm.

You shouldn't have to tell the client the piles are overstressed if they have been driven within tolerance.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources