INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Underpinning and Grade Beam Design

Underpinning and Grade Beam Design

Underpinning and Grade Beam Design

(OP)
I have a structure with a below grade basement all supported on spread footings.  Due to soil expansion we wish to underpin the structure with helical anchors and hydrovac soils from below the footer and install void form below the footer.  We are esentially turning a reinforced concrete basement wall and footing into a caisson and grade beam system.  My question is, how far can we space the helicals?  

The factored gravity loads are minimal, less than 2KLF, the helicals are capable of 35kips.  It seems to me my limiting factor is the capacity of my reinforced concrete basement wall that I am turning into a grade beam.  How do you analyze this wall?  Do I analyze it as a deep beam?  I've only got #4 horizontal and vertical at 24" o.c .. I've got no horizontal steel in my footer.  

Can I just analyze it as a normal beam?  The helical guys suggest prescriptive spacing but it makes me nervous having never done this before.

Thanks

 

RE: Underpinning and Grade Beam Design

The wall will act as a deep beam, so just use a truss analogy (or strut and tie method).  My first guess would be to space them to match the wall height.

RE: Underpinning and Grade Beam Design

Like Hokie66, I would go with a strut & tie model, (check ACI for height/thickness limits as you may run into those) but since you don't have horizontal steel in your footing (weird) I would base my analysis on keeping tensile loads in the wall below the modulus of rupture of your concrete, with some phi factors thrown in for good measure. At the minimum I would apply this concept to the bottom of the wall if you are sure there is adequate steel in the top of the wall.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources