INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

MV cable test.

MV cable test.

MV cable test.

(OP)
I have a 6km run of 6x 800mm XLPE 33kv rated cable (2xpostive 2x Neg , 2xNeutral ) for 25kv rail system. The run consists of 6 joints for each cable. Spec says to DC pressure test at 76kv , which i understand is a pass / fail test.. Considering the amount of moisture in jointing pits when joints were done , would there be a better cable test to perform ? to check integrity of cable and joints ..Partial discharge? VLF?

RE: MV cable test.

Thanks for your entry.The easiest and least expensive method would be to VLF test the cables for 30 minutes. Apply the IEEE400.2 test standards. If no failure ocurrs, the cable should be good for many years. Remember, everything is new. All you are trying to do is expose damage or defects caused during installation. Keep it simple and VLF hipot it. The PD test is good but not needed in this case.

vlfit

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources