INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Drawing List of material revision

Drawing List of material revision

Drawing List of material revision

(OP)
Revising the list of material.  Drawing will be Rev B.

Item 9 is a swivel leveling foot.
Engineer wants to replace it with a non-swiveling foot.
This is a new company I am with now.  Very lax drafting standards here.
Should Item 9 be lined through (deleted) on LOM and add new item # for new foot, (rev bubbles added where needed).
Or should Item 9 just be revd and description/part replaced with new foot.

Fit form function... well it is the same size, does the same thing, but it is a different part.

Any opinions?  
Thanks   

RE: Drawing List of material revision

What's the case for deleting and adding a new part number?  What value does it add?

The revision history or change notice should identify "Item 9 was foot co. p/n 12, now p/n 13.

Why tinker with the rest of the drawing needlessly?

RE: Drawing List of material revision

Strikethrough and new item number is the conservative method (many may say overkill).  Practically I think rev-ing the item number would pass muster in most companies.

Either would be vastly superior to the way things get done around here...

RE: Drawing List of material revision

Rev the item.
Call it a day.

Ted

RE: Drawing List of material revision

Back in my govt drawing pack days rule of thumb was that you didn't re-use item numbers.

However, as I mentioned above, a quick look through 14.34&14.35 didn't turn up much to support that - I may just have overlooked it though.

Posting guidelines FAQ731-376: Eng-Tips.com Forum Policies http://eng-tips.com/market.cfm? (probably not aimed specifically at you)
What is Engineering anyway: FAQ1088-1484: In layman terms, what is "engineering"?

RE: Drawing List of material revision

(OP)
Thanks.  I had also looked through ASME but could not find anything.

I had wanted to just strike through.  The checker said he had never seen it done that way before.

I can see a case for both methods.

Thanks  

RE: Drawing List of material revision

tacodog55,

   What CAD software are you using?

   When I first hacked with SolidWorks 2001, I determined that the strike-through capability of their bill of material software was not reliable.  I made a point of not using it.  Admittedly, SolidWorks has had lots of time to fix this bug.

   Another issue with SolidWorks, and I am sure, lots of other stuff, is what happens after you delete the bill of material, or the view controlling the bill of material?  There goes your strike-through.  If my drawing view does not work, I delete it and start again.  This is easy, and I wind up with a good, readable assembly drawing.

   We are using SolidWorks' Excel BOM.  Sometimes, this becomes corrupt, and there is no choice but to delete it and insert a new one.

   Take the case that you have implemented strike-through on your BOM, and you have a requirement to copy and paste the BOM to some other application.  In an Excel BOM, strike-through is implemented by fonts.  This will not work in a text only application like Notepad, or a database.

   There are a lot of good reasons to use strike-through on an old-fashioned, hand lettered BOM.  I would be very cautious about using it on a computer.

               JHG

RE: Drawing List of material revision

I agree with drawoh's point about CAD systems, a strikout method is unreliable at best with automaticaly created BOM's in Solidworks and Pro/E. It is probably the same in other software packages.

Peter Stockhausen
Senior Design Analyst (Checker)
Infotech Aerospace Services
www.infotechpr.net

RE: Drawing List of material revision

(OP)
We are STILL using IDEAS.  No strike through capabilites.  Just draw a line.

RE: Drawing List of material revision

Quote (tacodog55):


We are STILL using IDEAS.  No strike through capabilites.  Just draw a line.

   Meaning that your strike-through is completely unintelligent?

   One of the objectives of a 3D CAD system is type-once-use-everywhere.  The stuff that is not required on requisitions or in MRP, either should not be there or it should be ignored.  

   What happens when your in-house CAD monkeys check out your drawing with the line through the BOM item, and start changing stuff?

               JHG

RE: Drawing List of material revision

(OP)

Quote:

Meaning that your strike-through is completely unintelligent?
Yes.

The model and LOM are not connected.  LOM is not generated.  It is hand typed in.

 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources