INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Waterproofing

Waterproofing

Waterproofing

(OP)
The contractor is trying to proofroll the soil on a road construction project. They have discovered that water is migrating into the area from an adjacent undeveloped area. This is preventing the soil from drying sufficiently for them to proofroll.

Geotechnical borings prior to completion of design showed no water in any of the borings. There will be a drainage ditch along the edge of the roadway, but it won't be installed until an outfall structure is constructed. At this time there is nowhere to pump the water to, since adjacent areas are either undeveloped or privately owned by others.

The question arose as to whether or not the ditch can be over-excavated, and some material placed in it to form a temporary barrier until the road and/or outfall system are completed. Does anyone have experience with this or other methods of preventing migrating water from entering a construction area? The affected area is probably no more than 500 feet long.

RE: Waterproofing

Use perimeter ditching and pump water from the ditch. You are apparently getting cross flow from adjacent properties.  You have to intercept that flow with a ditch or swale that will allow access to the water to remove it.

You could use a grout curtain to intercept the flow, assuming you know the flow characteristics (limits of area, direction of flow).  That's expensive, but might be expedient for the construction.

Are you sure the problem is from lateral flow and not vertical?  I know your borings didn't show groundwater, but various soil conditions can be difficult to determine with respect to location, depth, and flow.

RE: Waterproofing

If you wish to make a dam, of sorts, assuming the ground is sufficiently porous to be carrying water laterally, you can cut it off, but the barrier needs to go down to an impervious layer.  

Other than what Ron has suggested, a simple barrier, not necessarily good for 100% stoppage, is a trench filled with compacted clay.  I've done that where a foundation was to be constructed in very porous stuff (fill)next to a river and it worked sufficiently well to get the job done without dewatering.  Not fancy, but sufficiently tight to hold back the water.

RE: Waterproofing

If it was my project I'd put the outfall structure in and get the permanent ditch in. I'd hate to go to the time and expense of putting in an impervious curtain only to find the water was coming from somewhere else. But if there's a real reason that can't be done, I'll go with Ron and say cut in some perimeter ditches, if you can't gravity drain them, bring in some pumps.

RE: Waterproofing

(OP)
Thanks guys. The answers confirmed what I hae been telling the engineer. It was decided to over-excavate the roadway an additional three feet and fill it with stiff clay to block the water. The stabilized subgrade and pavement will be put on top of that.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources