Vessel is being built according to ASME Section VIII Div 1.
Contractor came back saying that above mentioned code does not specify UT for nozzles.
I've alwyays thought that Nozzle-to-shell penetration welds shall be 100% UT examined.
Contractor is proposing use of MT and PT in lieu of UT.
By the way, our spec calls for 100%UT but this in not my area of expertise.
Thanks
Contractor came back saying that above mentioned code does not specify UT for nozzles.
I've alwyays thought that Nozzle-to-shell penetration welds shall be 100% UT examined.
Contractor is proposing use of MT and PT in lieu of UT.
By the way, our spec calls for 100%UT but this in not my area of expertise.
Thanks





RE: Nozzle welds
MT/PT of root and cap is a very poor substitute for UT of the full thickness of the weld. In reality, you are better off with an attentive welding inspector, 3rd-Party CWI prefferably, signing off on the fit-up and root of each nozz, and performing frequent [several times an hour] in-process welding inspections. 100% visual inspection 'VT' is MUCH better than MT/PT of the root [w/o seeing the fit-up], and MT/PT of the cap. Additionally, MT/PT is typically done by an NDT tech, who may not have any training in visual inspection of welds. You need a CWI.
RE: Nozzle welds