Update displaying view
Update displaying view
(OP)
Hi,
when I switch from a drawing to an assembly, not very big, the refreshing views, take a lot of time..1 min.
If the assembly is big, 2 min.
This lose time x n°switch...in the work day, it's lot time lose.
There are some setting to avoid this losing time, maybe refresh only the work view for example.
other users have the same problem ?
when I switch from a drawing to an assembly, not very big, the refreshing views, take a lot of time..1 min.
If the assembly is big, 2 min.
This lose time x n°switch...in the work day, it's lot time lose.
There are some setting to avoid this losing time, maybe refresh only the work view for example.
other users have the same problem ?
Thank you...
Using NX7.0 and TC8.1





RE: Update displaying view
John R. Baker, P.E.
Product 'Evangelist'
Product Design Solutions
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
http://www.siemens.com/plm
http://www.plmworld.org/museum/
To an Engineer, the glass is twice as big as it needs to be.
RE: Update displaying view
but we have switched to NX7 some months ago, and we haven't planned to re-switch again.
Thank you...
Using NX7.0 and TC8.1
RE: Update displaying view
RE: Update displaying view
John R. Baker, P.E.
Product 'Evangelist'
Product Design Solutions
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
http://www.siemens.com/plm
http://www.plmworld.org/museum/
To an Engineer, the glass is twice as big as it needs to be.
RE: Update displaying view
I updated my signature.
Thank you...
Using NX 7.0.1.7 MP1 and TC8.1