Corrosion rate reduction from Corrosion probe
Corrosion rate reduction from Corrosion probe
(OP)
Hi, We are having a LPR corrosion probe in closed loop Cooling water circuit operating since 9 months approx, Corrosion rate was 0.5mpy for last 2-3 months and current mesured rate is 0.0 with Imbalance 0.5.
Can corrosion rate be reduced in LPR probes or there is any problem with the instrument. Please clarify in detail
Can corrosion rate be reduced in LPR probes or there is any problem with the instrument. Please clarify in detail





RE: Corrosion rate reduction from Corrosion probe
RE: Corrosion rate reduction from Corrosion probe
However, we planned to retract the probe for checking its condition.