×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Clay Moisture Approaching Liquid Limit

Clay Moisture Approaching Liquid Limit

Clay Moisture Approaching Liquid Limit

(OP)
Looking at a foundation design of a stiff clay that has a moisture content of +/- 20% near the surface (swelling active zone), and then changes abruptly to ~ 40% around 7 feet down.  However, below about 18 feet, the clay moisture content is ~ + 60% (plastic limit is about 30% and liquid limit is about 70%).  A glacial till is found below this at about 25 feet.  Building a 4 storey structure with underground parkade.  Does anyone have any guidelines on bearing / settlement of a clay as it approaches the liquid limit?

RE: Clay Moisture Approaching Liquid Limit

Do you not have any more information than some Atterberg limits and water contents?  Any undrained shear strengths?  Any consolidation tests?  Any SPT values? Where, in general, is the site?

RE: Clay Moisture Approaching Liquid Limit

You have a highly compressible clay layer ( void ratio should be around 1.6 and Cc around 0.5). Pile your buiding down to the till.

RE: Clay Moisture Approaching Liquid Limit

Big Harvey - but he is building a basement, say, 10 ft deep which unloads the site considerably.  If he builds the structure with the basement as a floating or buoyant foundation he probably will be able to compensate the weight of the building with the soil removed and be able to achieve the parkade below grade and the building without piles. (See Winterkorn and Fang's Foundation Engineering Handbook, First Edition, 1975, Chapter 12 by Hugh Q. Golder)

RE: Clay Moisture Approaching Liquid Limit

Sorry BigH, I missed the basement. Constructing the basement will certainly be a nightmare because he will be excavating in a clay with w=40%++ at the level of the mat.We should be above water table but I would definitely consider overexcavation and put a nice crushed stone mattress underneath the mat, say 1 meter. Most of the settlement will come from the remolded materials just underneath the foundation.

RE: Clay Moisture Approaching Liquid Limit

With clay you should be able to excavate below - but you are right in that the base may be a bit soft - so throw in a working platform.  There was a case history in Guyana (very soft clay) where the buoyant raft foundation was used. (I think that R.M. Hardy was involved.)  I'll find the details tomorrow at work.

RE: Clay Moisture Approaching Liquid Limit

One other thing to keep in mind is that calys at or near LL are sensitve to vibration, such as sheetpile instalation. the effects of construction should be considered in your design.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources