INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Trench Layback

Trench Layback

Trench Layback

(OP)
When digging a utility trench, a waterline for ex., in hawaii if the trench height is above 4ft, shoring or layback is required.

ex: The trench section requires the final backfill material to the bottom of subgrade to be select granular fill.

The question is: When sloping or benching the trench from the 4ft elevation and above, can you get away with throwing that excavated material back into the trench to fill the sides (where we laidback the trench), or will you actually fill the sloped sides (voids) with the select granular fill?

RE: Trench Layback

I think it depends on what is going on top, ie. road/sidewalk/landscape. You show topsoil. So unless it is critical (and the spoils ie.excavated dirt are poor material) then it should be OK. Aloha.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources