INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Existing Soil Materials

Existing Soil Materials

Existing Soil Materials

(OP)
We had just demo the existing concrete slab which was damage due to upheaving from swelling of soil materials (clay type soil. What should I do with the existing soil before we place the new concrete slab?  Should I take a sample and get a proctor on it and re-condition and re-use it? Should I replace it with basecourse that do not absorb to much water?

 

RE: Existing Soil Materials

I think this is a matter on how much heave is able to be delivered by the subsoil. Normally a replacement of the same will be the path to take. Otherwise you may need to consider a structural slab on piles well anchored able to control the heave, on void forms or alike. Since this kind of problem is recurrent in the areas, maybe asking someone (contractor, engineer) may give a correct answer and evaluation about the local way to proceed.

RE: Existing Soil Materials

For frost heave to occur, one of 2 things needs to happen.  Water in soil or freezing temperatures.  Eliminate either one of these and heave will not occur.  If the location cannot be insulated to prevent freezing temps, then remove and replace with a material that will not hold water (sand, clean aggregate, etc.)
 

RE: Existing Soil Materials

or extend footings below the frost depth

RE: Existing Soil Materials

There seems to be too many unknowns to make such a decision to just replace the old slab with a new one.  You should have a geotechnical engineer do a proper investigation (soil borings & lab tests) and recommend a new course of action. It may be that a new slab can be placed but you they may also recommend removal/ replacement of offending soils, structural suspension, elevate on select fill or soil modification.  They should also recommend that you take measures keep water away from the new slab.

Good Luck

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources