×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Quick & Dirty Digester Sizing

Quick & Dirty Digester Sizing

Quick & Dirty Digester Sizing

(OP)
I'm doing some preliminary planning and evaluation for an anaerobic digester at an existing WWTP. The plant design flow is 8 MGD and treats almost entirely domestic flow with nothing too exotic.

Are there any rules of thumb to come up with a tank volume / footprint that could be used to get me in the ball park...at least to see if it's worth it for the client to have us dive a bit deeper into it.

Thanks,

Mike

RE: Quick & Dirty Digester Sizing

My understanding is that anaerobic digesters are not cost effective unless you have plant larger than 10 MGD or if you have primary sludge.

RE: Quick & Dirty Digester Sizing

(OP)
I suspect you may be right, I wasnt sure where the threshold was but was also of the understanding anaerobic was better suited for larger plants. This paticular plant has primary and secondary clarifiers. Currently the sludge is mixed and sent to a small thickner / holding tank before being pressed.  

RE: Quick & Dirty Digester Sizing

Most smaller facilities are going with aerobic digesters at the present time. People are also moving away from the use of primary clarifiers.

You will have to check with the solids handling regulations from the agency in your locale for proper sizing.

You should also include a sludge thickener (gravity dewater screen) to reduce the size of the facility.

Here is an example from one state:

http://www.ipcb.state.il.us/documents/dsweb/Get/Document-12042/

Empirical Design
When such calculations are not submitted to justify the
design based on the above factors, the minimum combined
digestion tank capacity outlined below will be required.
Such requirements assume that the raw sludge is derived from
ordinary domestic wastewater, a digestion temperature is to
be maintained in the range of 85 to 95 F (29 to 35 C), 40
to 50 percent volatile matter in the digested sludge, and
that the digested sludge will be removed frequently from the
process. (See also subsection (a)(1) above and Section

370.860(a)(1).)
A) Completely Mixed Systems
For digestion systems providing for intimate and effective mixing of the digester contents, the systemmay be loaded up to 80 pounds of volatile solids per 1000 cubic feet of volume per day in the active digestion units.

RE: Quick & Dirty Digester Sizing

Design criteria for a high rate digestors (From Wastewater Treatment Plant Design WPCF & ASCE)

Solids Retention Time 10 to 20 Days
Solids loading Lb VSS/Day/Cu.ft 0.1 to 0.40
Volume
Primary Sludge + Waste Activated Sludge 2.67 to 4 Cu.Ft/ Capita

Combined primary plus waste biological sludge feed concetration % solids (dry basis) 4 to 6
Digestor underflow concentration % soldis (dry basis) 4 to 6



 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources