INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

How to calculate the setting of a pressure balanced safety joint?

How to calculate the setting of a pressure balanced safety joint?

How to calculate the setting of a pressure balanced safety joint?

(OP)
I have a piping configuration where a feeder pipline (4" S/80 API 5L Gr. B) ties into a receiving pipeline subsea (as shown on the attached). The feeder pipeline travels parallel to the receiving pipeline just before it 90's into the receiving pipeline. Just before the feeder pipeline travels parellel to the receivng pipeline, there will be a pressure balanced safety joint installed. What is the "industry accepted method" of calculating the setting of the pressure balanced safety joint? I have used Ceasar II pipe stress software but my numbers do not match some hand calcs that were done. Thanks for your help.

RE: How to calculate the setting of a pressure balanced safety joint?

Set it based on the maximum tension load you can have either on the tie-in, or on the pipeline, which should be larger than the tension load indicated by your stress run.

"I am sure it can be done. I've seen it on the internet."  BigInch's favorite client.

"Being GREEN isn't easy." Kermitfrog http://www.youtube.com/watch?v=hpiIWMWWVco

http://virtualpipeline.spaces.live.com

RE: How to calculate the setting of a pressure balanced safety joint?

(OP)
By applying an axial force of 10,426 lb. to the pipeline in the direction away from the tie-in, the max axial stress created is 2,305 lb/in^2 and the max code stress created is 38,942 lb/in^2. The pipeline has an allowable stress of 46,071 lb/in^2. What should the PBSJ be set at?

RE: How to calculate the setting of a pressure balanced safety joint?

You're trying to protect the tie-in and the other pipeline.  The maximum tension on the pipeline isn't what I'd be worried about.  That is most likely higher than what you can have on the tie-in configuration.  What is the maximum tension you can have at the safety joint without overstressing or deforming the tie-in or connecting pipeline.

You'll have to check with the mfgr about the calculations for set pressure.

"I am sure it can be done. I've seen it on the internet."  BigInch's favorite client.

"Being GREEN isn't easy." Kermitfrog http://www.youtube.com/watch?v=hpiIWMWWVco

http://virtualpipeline.spaces.live.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources