INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Nozzles Fabrication

Nozzles Fabrication

Nozzles Fabrication

(OP)
An attachment was mark up of the final fabrication drawings for the Froth Deaerator showing that two of the nozzles were fabricated without meeting the dimensions. 2" short. I am being asked to see if piping can accommodate this discrep, but I have been advised to check to see what the norm is for accepting errors like this.  I guess I am asking that if you were inspecting this, and came across this issue, what action would you take?  Should we ask for vendor to fix it?  Should we adjust piping to accommodate?

 

RE: Nozzles Fabrication

It would be preferable to make the adjustment elsewhere if that stuff hasn't already been fabbed.  I say this because, while a too-short nozzle is undesirable, reworking welded fittings is undesirable, too, so you're not necessarily gaining any value when you make the change.

I've seen solid plate flanges used as a spacer in between flange, and can't think what that's called, but it might be an option.

RE: Nozzles Fabrication

If there is nothing design-wise that would mandate the need for a longer nozzle, then it is typically less expensive, less time consuming, and less authority involved when splicing in a pup piece to compensate for the length once the vessel is on site.  

A common course of action would be to write a nonconformance on the vessel, give the vendor a padded rework cost for the pipe, and let them decide if they're going to come out and repair/replace the nozzle, or just eat your backcharge on the pipe rework.  In my experience, the latter wins out 95% of the time.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources