INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Plumbing below a mat foundation

Plumbing below a mat foundation

Plumbing below a mat foundation

(OP)
I have a 10" mat foundation with #5 top and bottom 16" c/c supporting a 5-story cold formed metal frame dorm - any thoughts on how the underslab plumbing should be addressed.  The mat has been modeled in RAM Concept - and I'm showing a worse case applied soil bearing pressure of around 2000 psf and I have an allowable of 4,000 psf.  Thanks for any detailing thoughts/warnings/etc... in advance.

RE: Plumbing below a mat foundation

Leave the openings in the slab to access and construct the plumbing. Once completed, plug the holes. Specify some kind of rebar splicers, and proper compaction of the fill material.  

RE: Plumbing below a mat foundation

Are you hanging the piping from the mat? In NYC the building codes requires this if the structure is a school facility.

RE: Plumbing below a mat foundation

(OP)
Not hanging - the pipes are mostly waste drains that will be installed and sleeved up through the mat.

thanks for your thoughts.

RE: Plumbing below a mat foundation

I've been involved with many such designs.  Never have they left places for later placing pipes.  Pipes go in first and the slab later.  If concerns about differential settlement, then use more than the minimum slopes for the waste pipes.

RE: Plumbing below a mat foundation

You could probably follow typical roadway specs where it's a minimum distance below the ground surface and surrounded by gravel. You could also verify that the specs indicate a minimum load rated pipe. For 2000 psf a HS20 load rated pipe may be satisfactory. It's kind of a best judgement based on load and the ability of the soil forces getting around the pipe by overstessing the soil adjacent. The mat can also span the distance typically.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.