INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Nozzle loads

Nozzle loads

Nozzle loads

(OP)
For one of the charge pumps in a refinery plant, as per the licensor P&ID, the line size is 12 inches where as the pump offered by the vendors is 6" suction and 6" discharge ( TOP-TOP). Can there be so much difference between the suction line and the suction nozzle size selected by the pump vendor? What are the criteria to follow to decide on the nozzle size of the Pump. As the service fluid is for high temperature ( around 300 deg C). Because of this the nozzle loads to the pump is also getting increased and we have not yet approached the pump vendors to check for the possibility of increasing the allowable nozzle loads for the pump suction and discharge from the 2 times of API 610 load values. Is this the correct approach. The pump rated capacity is 220 m3/hr and the discharge pressure is 37 barg. Thanks to clarify.

RE: Nozzle loads

Seems strange to have such a difference in diameters.  Is it a high speed pump?  Actually 6" seems low and your plant's 12" seems just a bit high.  I would think 8 pump nozzle and 10" plant piping might work out better.

I doubt you'll make much progress trying to get the pump vendor to change the allowable loads.  Work towards adding expansion loops and other stress solutions is likely to be more productive.

"I am sure it can be done. I've seen it on the internet."  BigInch's favorite client.

"Being GREEN isn't easy." Kermitfrog http://www.youtube.com/watch?v=hpiIWMWWVco

http://virtualpipeline.spaces.live.com

RE: Nozzle loads

Agree with BigInch. 6" is small for 220 m³/h. That leads to a fluid velocity of around 3.5 m/s - pretty high on the suction side.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources