INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Minimum height of grade ring required for concrete manhole

Minimum height of grade ring required for concrete manhole

Minimum height of grade ring required for concrete manhole

(OP)
The minimum height of concrete grade ring for manholes/sanitary manholes is specified as 150mm on IFC dwgs for a project I am working on.
I got a phone call from Conctractor saying that this minimum height requirement could not be met because the elevation of some manholes installed was higher, and as a result, the maximum height of 75 mm for grade ring was the only option to choose.
As a structural(foundation) engineer, I am wondering what risks I will have by accepting this height (75mm) in lieu of 150mm. By using this height, the final grade will be very close to the design elevation (maximum allowable deviation for grade elev. is 25mm).
Thanks for your tips and advice in advance.

RE: Minimum height of grade ring required for concrete manhole

Tell the contractor he screwed up by setting the manhole too high...now he has to fix it. He can tear it out and start over or provide a plausible repair method for review.

RE: Minimum height of grade ring required for concrete manhole

really? why would you not allow a 3 inch grade ring and only 6 inch ones? Why was it not allowed in the first place? Seems extreme to me to remove and replace and I fail to see why a 3 inch ring would not be completely acceptable.

RE: Minimum height of grade ring required for concrete manhole

In our area a 6" (150 mm) grade ring is the normal minimum. This is apparently so if the road grade ever needed to be lowered a few inches, or if the road surface settled realtive to the manhole, it could be accommodated by a simple grade ring adjustment. However this minimum is often relaxed, as future road lowering is very unlikely in most cases. In some cases no grade rings are provided.

RE: Minimum height of grade ring required for concrete manhole

cvg..you're right. I misunderstood the post...thought he had nowhere to go with the height.

 

RE: Minimum height of grade ring required for concrete manhole

(OP)
I checked with our civil designer regarding this matter. As CarlB said, I guess any potential change in the grade elevation in the future is unlikely. He advised me to accept as is. Sounds like 150mm is typical, but the rule could be bent depending on the situation.
Thanks guys for your opinions!

RE: Minimum height of grade ring required for concrete manhole

our standard also shows 6 inch minimum, 8 inch maximum - but on the same detail it also allows bricks to be used as an alternative to grade rings with no apparent criteria for type of brick or size. For installation in the street, no grade ring is used at all, an 8 inch thick by 12 inch wide minimum concrete collar is used. If the pavement settles or needs to be raised, get out the jackhammer in order to adjust the manhole.

RE: Minimum height of grade ring required for concrete manhole

Is it possible that your code means 150 mm min., but which can be composed of two at 75 mm? We commonly use 75 mm rings, and as mentioned, bricks are also acceptable. Just a thought.

RE: Minimum height of grade ring required for concrete manhole

(OP)
@ cvg, our standard shows 150mm minimum and 350mm maximum. Again, I am not familiar with grading/earthwork stuff, but I guess it depends on who designs, how much room you have for adjustment in the future and such. I didn't know that bricks can substitute concrete grade ring. Thanks for the extra info that is valuable.

@ beton1, I am not sure, but I would say why not? For clarification, what specifies 150 mm as minimum is not a code but our standard drawing (either coming from a code or a typical practice?).

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources