INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Riprap - launchable toe - trenched toe and construction

Riprap - launchable toe - trenched toe and construction

Riprap - launchable toe - trenched toe and construction

(OP)
If constructing underwater or construction "in the wet", does anyone know if there are guidelines to when to excavate and construct a "trench toe"?  I'm looking in an area that can be as deep as 15 feet below sea level.  The trench toe (launchable riprap toe) would be excavated under the toe of the slope to launch as scouring occurs to the max scour depth.  The slope toe in several areas of the river can be more than 10 feet below the mean lower low, so am concerned if it is possible for this type of rock protection.  The other option was the mounded toe, but my concern is that due to the volume required that it would be a problem with the obstruction to flow.  

RE: Riprap - launchable toe - trenched toe and construction

"launchable" riprap is generally mounded or laid flat in a trench on the invert of the channel. As opposed to a "toe-down" where a trench is dug at the final slope, lined with riprap and then backfilled. I think it would be very difficult in the wet to construct anything other than the mounded launchable riprap toe. This is also consistent with guidance from the Corps of Engineers Engineer Manual
1110-2-1601, see section 3.10(d)

RE: Riprap - launchable toe - trenched toe and construction

(OP)
Thank you for the good response.  I have read USACE 1601, but was hoping to find a case study or construction info of the "toe-down" type where a trench is dug.  But I like you said, it's probably too difficult to attempt in the wet.  Thanks for the informative response.

RE: Riprap - launchable toe - trenched toe and construction

we have looked at numerous projects in the area and unless the scour depth is minimal, a launchable toe always ends up the most cost effective, quickest schedule, least environmental impact and least risky method.  

RE: Riprap - launchable toe - trenched toe and construction

(OP)
Do you have much experience with using a mounded toe excavated back into the slope to avoid obstruction of flow on top of the bank?  If so, do you know of any good examples I may find online, and what your experience with them has been?   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources