INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Purge And Drain Batch Reactor Dilemma

Purge And Drain Batch Reactor Dilemma

Purge And Drain Batch Reactor Dilemma

(OP)
Dear all Professinal engineers

I am sorry to bother you this trivial question. I tryied to establish procedures of purging and draining of batch reactor after last batch.

The procesure is following ( and drawing is atttached)

* The Reactor ready to purge( but I am not sure DO I HAVE TO ISOLATE THIS REACTOR CAUSE IT HAS MANY INLET VALVES)

* Open XV-01.

* Open HV-02 100% ( not sure why do I have to put this recirculation valve fully open)

* Close XV-10 and XV-11 (transfering line to the next vessel for treatment)

* Switch PIC-75 to automatic mode at 1.5 barg.

* Open XV-76 and XV-75 (nitrogen to Reactor)

* Wait PIC-75 reaches 1.5 barg, switch it to manual (close PV-75)

* treatment vessel is in vacuum: open XV-26 and XV-23 (vacuum to Vessel, I wonder if put this vessel in much higher vaccum, do we can get more stuff from reactor?)

* Wait until PIC-26 reaches 650 mbara and close XV-26 and XV-23

* Open XV-10 and XV-11

* Open XV-21(post-treatment inlet)

* Observe the increase in post-treatment vessel pressure (PIT-01) until it reaches 1.05 barg

* Open XV-26 and XV-27 (treatment Vessel vent to scrubber)

* Wait Reactor pressure PI-07. PV be less than 0.2 barg

Repeat the last 10 steps twice.

* Close XV-11 and XV-10

* Pressurize Reactor: Switch PIC-75 to automatic mode at 1.0 barg.

* treatment vessel in vacuum: open XV-26 and XV-23 (vacuum to Vessel)

* Wait until PIC-26 reaches 650 mbara and close XV-26 and XV-23

* Open XV-A (drain)

* Open XV-B (drain)

* Open XV-11 and XV-21

* Wait Reactor pressure PI-007. PV be less than 0.2 barg



Repeat two times

* Close XV-76 and XV-75 (nitrogen to Reactor) ( I wonder do I have to CLOSE ALL VALVE THAT OPEN BEFORE?)

* Panel operator shall open XV-C (ODR,organic drain) and request field operator to check Reactor drainage

* Panel operator shall open XV-E (EDR,effluent drain) and request field operator to check Reactor drainage

* Field operator shall confirm the Reactor is empty


I am sorry to put the flow diagram in this ms. painter (there is no MS. software installed in the PC I used)

Thank you very much for your kindly help and advice.
 

RE: Purge And Drain Batch Reactor Dilemma

(OP)
Please forgive me. I forgot to put "heat exchager" beside the graph of the discharge side of the pump.   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources