INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

CIP footings for precast rigid frame

CIP footings for precast rigid frame

CIP footings for precast rigid frame

(OP)
I posted this question in the Structural Engineering forum but thought I would try here too:

I'm designing cast in place footings for a precast 3-sided culvert using LRFD and am looking for a design example.  I want to include live load in the vertical stress calculation but I'm not sure if I should distribute it over 1 ft "strips" and apply the Strength I factor of 1.75 or if I should estimate it as a surcharge and apply the EV factor of 1.35 (AASHTO LRFD Figure C11.5.5-1).

I'm using HS-20 loading and the soil engineer gave me the ultimate bearing capacity of the foundation soil with a resistance factor of 0.45.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources