INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Bridge Moving Load in Sap2000

Bridge Moving Load in Sap2000

Bridge Moving Load in Sap2000

(OP)
Without Sap2000 bridge modeler, if I want to model vehicle load in sap2000, anybody knows how the load being distributed to the member? Should I input the distribution factor manually? If the load is just attached to the frame memeber below but the frame members are not exactly where the lane locates, the load will correctly being transferred?  

RE: Bridge Moving Load in Sap2000

Good question bluefish, unfortunately I can only hint a few points, because I am not really good at this

I will use a girder bridge for an example

Suppose you have 4 girders and 3 lanes.

Then each lane is supported by one or two girders.

YOu must define the lanes. And associate each girder with whatever lanes it takes load from specifying distance fro the centrelines. This can be very messy and you need to exercise patience here. So girder 2 for example probably takes load from lane 1 and 2, and it may be that girder 2 is 6ft(2m) from lane 1 but only 3ft(1m) from lane 2.

Then for each lane you must define the vehicle loading. This is easy because vehicle loads are essentially lane loads.

I used this once and I got great results, clean influence lines and total moments and shears.

To start with, re-solve the simple example given in the tutorials. The rest will be easier to follow

respects
ijr
 

RE: Bridge Moving Load in Sap2000

(OP)
You mean When I define lane 2 I need to input twice? To associate lane 2 to Girder 2 and Girder 3? I don't think sap let you do that.

RE: Bridge Moving Load in Sap2000

Have you checked the tutorial? It hints that bluefish.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources