Pack and Go not keeping referneces
Pack and Go not keeping referneces
(OP)
SWX 2010 4.0
We are currently seeing some issues when we pack and go Our assemblies to our server. Sometimes, not all the time we are losing are part to part references, which is causing our top-level assembly to constantly rebuild, plus we lose our references, so if we do change anything, we have to manually reattach reference
please advise
We are currently seeing some issues when we pack and go Our assemblies to our server. Sometimes, not all the time we are losing are part to part references, which is causing our top-level assembly to constantly rebuild, plus we lose our references, so if we do change anything, we have to manually reattach reference
please advise






RE: Pack and Go not keeping referneces
When you say "part to part references", do you mean in context relationships? If so, I'll add this to my list of reasons to not use them.
Jeff Mirisola, CSWP
Design Manager/Senior Designer
M9 Defense
My Blog
RE: Pack and Go not keeping referneces
we are now starting to log them
For example of the type of reference
making planes or sketched from geometry of one part, onto another
RE: Pack and Go not keeping referneces
Are you creating a complete P and G of all components flattened to a single folder?
RE: Pack and Go not keeping referneces
we are performing a complete pack and go, but not flattening to one folder, we like to maintain a certain folder strucure
RE: Pack and Go not keeping referneces
RE: Pack and Go not keeping referneces
RE: Pack and Go not keeping referneces
Colin Fitzpatrick (aka Macduff)
Mechanical Designer
Solidworks 2010 SP 3.1
Dell 490 XP Pro SP 2
Xeon CPU 3.00 GHz 3.00 GB of RAM
nVida Quadro FX 3450 512 MB
3D Connexion-SpaceExplorer
RE: Pack and Go not keeping referneces
was that you need to have your job folders list in the reference file locations under tabs and options