ASME B31.1 Alowable number of repairs on one weld
ASME B31.1 Alowable number of repairs on one weld
(OP)
I was not able to locate the number of repairs alowed by ASME in any of their codes. Is there a set number of repairs allowed prior to a mandatory cut out and reweld?





RE: ASME B31.1 Alowable number of repairs on one weld
RE: ASME B31.1 Alowable number of repairs on one weld