INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Grade Beam Control Joints

Grade Beam Control Joints

Grade Beam Control Joints

(OP)
What considerations are important for grade beam control joints?  Are there any special requirements for lap splicing reinforcement across control joints?  This particular grade beam will be tied to a slab.  Do I need grade beam control joints everywhere there is a slab control joint or can do every other one instead?

RE: Grade Beam Control Joints

At the risk of seeming uptight, terminology is very important when talking about joints in concrete.
"Control Joint" is ambiguous.
I believe ACI uses the term Construction Joint for what contractors term as a "cold joint."  That is, a break in the pour.  It is the engineer's responsibility to define the continuity (or not) of reinforcing across the joint.
Are you referring to a "Shrinkage Contraction Joint?"  Here the reinforcing may be reduced to 0% or 50% - this is used primarily in slab-on-grade construction, and not for structural slabs.
If the grade beam is carrying axial load (interconnecting columns) or bending load, use a construction joint with 100% reinforcing running thru the joint.
You can have SCJs above and still have continuous reinf in the grade beams below.  Cracking will be more unpredictable (that is, more than usual).  Use sealant in the SCJs.

RE: Grade Beam Control Joints

I always referred to a cold joint as an accidental joint in the concrete caused by trucks not showing up on time, leaving the concrete that was poured first to cure and thereby ruining what was supposed to be a monolithic pour.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.