INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Released UG models and drawings being affected by lower level changes.

Released UG models and drawings being affected by lower level changes.

Released UG models and drawings being affected by lower level changes.

(OP)
At the company that I'm currently working at,
we release ICD(Interface Control Drawings)before all of the lower level drawings are complete.

Then when a lower level change is made, the released ICD model and drawing changes. I would think that once an upper lever drawing or model is released, that it is written in stone and nothing but the starting of a new revision should cause these lower level changes to flow up.

Shouldn't released models and drawing be protected from lower level changes flowing up, until a new upper level revision is started?

RE: Released UG models and drawings being affected by lower level changes.

(OP)
This may actually be a Team Center issue rather than UG.
From a Team Center stand point, how should this be handled.

RE: Released UG models and drawings being affected by lower level changes.

Welcome to live updates. More than one company I know of has decided that the only way around that is to have no revisions to lower level parts. If it needs revised...take out a new number. Even that is not an infallible solution. The companies that decide to live with the revision issue have to institute Draconian measures to force engineers to follow procedures. One missed live change can cost multitudes of dollars.

RE: Released UG models and drawings being affected by lower level changes.

Whether you are using teamcentre of native systems there are ways to ensure that when you load assemblies the later data is or is not available. In native it relies on file naming and turning off load latest if file name versioning is enabled. In Teamcenter it is all about the PSE and whether assemblies are locked to precise or not. They should be when released, and at any time otherwise your interface control drawing can be locked and opened from the PSE rather than via the NX File>Open interface. To some extent it will very much matter how well and completely Teamcenter has been implemented at your site as to how much control versus convenience you're likely to enjoy under Teamcenter.

Best Regards

Hudson

www.jamb.com.au

Nil Desperandum illegitimi non carborundum

RE: Released UG models and drawings being affected by lower level changes.

(OP)
Thanks guys.  I appreciate it. I'll look at it from the PSE standpoint.

I really appreciate the help.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources