Generic ITP for inductrial construction/fabrication
Generic ITP for inductrial construction/fabrication
(OP)
thread286-192823: QA/QC for Industrial Construction?
Hi, guys.. I just joined seconds ago.
Pls help/share with me generic inspection/test planning for industrial construction/fabrication. Thanks,
Hi, guys.. I just joined seconds ago.
Pls help/share with me generic inspection/test planning for industrial construction/fabrication. Thanks,





RE: Generic ITP for inductrial construction/fabrication
RE: Generic ITP for inductrial construction/fabrication
What I sought & still seek is some QA/QC program as an inspection test plan (ITP) that may generally be applicable for industrial construction/fabrication.
Items applicable below may be applicable, correct?
... your more inputs, please?
1- WPS+PQR
2- welder test
3- fit up check
4- visual check
5- NDT check and extent.
6- Final test and dimentional control
7- FAT ( factory acceptance test)
8- release for shipment and certificates.
9.... ???
PS: the previous attachment was supposed to be ISO 10006:2003.
RE: Generic ITP for inductrial construction/fabrication
RE: Generic ITP for inductrial construction/fabrication
1. Approved, selected WPS is followed.
2. Welders weld within their qualification limits.
3. PWHT verified, if applicable.
4. Coatings Check
4a. Surface preparation acceptable
4b. Check humidity & temperature
4c. Check coating system (assure pot life not xceeded (for plural component systems)
4d. Wet film thickness
4e. Dry film thickness
4f. Final visual
RE: Generic ITP for inductrial construction/fabrication
RE: Generic ITP for inductrial construction/fabrication
RE: Generic ITP for inductrial construction/fabrication
Then pls advise common factors that generally needs considering for construction/fabrication ITP... for points like HOLD point, CHECKUP doc, WITNESS, APPROVED ...???
RE: Generic ITP for inductrial construction/fabrication
1. To elaborate the ITP must have clear the steps of manufacture and the points of inspection required by the codes, specifications and other requirements of the project.
2. To establish the level of inspection (visits, frequency, permanent ....).
3. To establish the points (D,R, W, HP ...) for each of the parts involved (Production, QA/QC, Inspection, organism attestor, owner ......)
For Production and QA/QC all points are D,R and W
For Inspection or Third Party usually Hidrotest and releaseare Hold Point.