INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

osha regs and cable clamps for suspension cables for a suspended scaff

osha regs and cable clamps for suspension cables for a suspended scaff

osha regs and cable clamps for suspension cables for a suspended scaff

(OP)
i am designing a scaffold that is suspended by cables.  we are planning on using specific lgt cable chokers with thimbles as required per osha but i am wondering  if the "fist grip" clamps can be used instead, to make enable the height adjustment to be easier.  at first i was thinking they were not allowed, but after further reading in the regs, it appears that they are.  if we use them they would have to be torqued after loaded then before every shift.  Crosby recommends 3 clamps for a 5/8" cable but i am wondering if more clamps are required since it will be supporting people

what are your thoughts?

thanks   

RE: osha regs and cable clamps for suspension cables for a suspended scaff

1926.451(d)(12)

When wire rope clips are used on suspension scaffolds:

(i) There shall be a minimum of 3 wire rope clips installed, with the clips a minimum of 6 rope diameters apart;

(ii) Clips shall be installed according to the manufacturer's recommendations;

(iii) Clips shall be retightened to the manufacturer's recommendations after the initial loading;

(iv) Clips shall be inspected and retightened to the manufacturer's recommendations at the start of each workshift thereafter;

(v) U-bolt clips shall not be used at the point of suspension for any scaffold hoist;

(vi) When U-bolt clips are used, the U-bolt shall be placed over the dead end of the rope, and the saddle shall be placed over the live end of the rope.
--

--
1910.28(p)(5)
    When a hanging scaffold is supported by means of wire rope, such wire rope shall be wrapped at least twice around the supporting members and twice around the bearers of the scaffold, with each end of the wire rope secured by at least three standard wire-rope clips.
--

29 CFR 1910 is general industry, and 29 CFR 1926 is construction industry.

RE: osha regs and cable clamps for suspension cables for a suspended scaff

TX pretty much hit it on the head.

I noticed you said something about chockers - just make sure they can't "bite" into the material they are choking.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources