INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pipeline post weld heat treatment

Pipeline post weld heat treatment

Pipeline post weld heat treatment

(OP)
On a typical pipeline automatic welding spread how soon after the last weld run (fill and cap pass)can/does PWHT take place i.e. how many joints after and typically how long would PWHT process be for heavy wall pipe around 10"?

 

RE: Pipeline post weld heat treatment

What is the material and wall thickness??????

RE: Pipeline post weld heat treatment

(OP)
API 5L X60 50mm wt

RE: Pipeline post weld heat treatment

Regarding PWHT for P-No 1 or S-No 1 base material, there is no requirement for delay of PWHT, this can be done anytime after the weld is completed provided the welds are protected from exposure to harmful forces or stresses prior to PWHT. For PWHT requirements, review ASME B31.3, Table 331.1.1, normally 1 hr/inch (or 2.4 min/mm) of nominal thickness.

RE: Pipeline post weld heat treatment

The time duration is not addressed in ASME B31.4 and B31.8. As a practical matter and assuming the pipe is to be buried, it should be done as rapidly as possible after required NDE to permit ongoing joint wrapping and burial activities.  

RE: Pipeline post weld heat treatment

(OP)

Would NDE (proposing AUT) be carried out before PWHT.. is this usual?

RE: Pipeline post weld heat treatment

For S-No 1 base material, NDE can be carried out before PWHT. Is this usual, lets say it's typical.

RE: Pipeline post weld heat treatment

PWHT should be done immediately.  NDT should be done after PWHT.

RE: Pipeline post weld heat treatment

Make sure field PWHT is at a temp colder than mill temper or some strength will be lost.

RE: Pipeline post weld heat treatment

(OP)
I'm assuming S-No 1 base material is applicable to API5L X60 line pipe steel with heavy wall.

Ideally we want to carryout AUT straight after welding this allows tight process control and fewer defects for repair if the spread has problems. If we wait until after PWHT given time for each joint (hours)then the spread is gone and process control lost.

RE: Pipeline post weld heat treatment

That is fine for this application. There is NO code requirement for NDT to be performed after PWHT. In other words, as long as welding is completed, NDT can be performed. If a client requests NDT to be performed specifically after PWHT, this is their choice and must be followed.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources