How to plot Vertical Displacement vs. Percent of Load Diagram?
How to plot Vertical Displacement vs. Percent of Load Diagram?
(OP)
In SAP2000, how do I get a graph like following? I do not mind to plot this graph point by point in a spreadsheet, but I do not know how to get the percent of the full load data. Thanks.





RE: How to plot Vertical Displacement vs. Percent of Load Diagram?
LOAD COMBINATION 1: 0.10 x DEAD LOADS
LOAD COMBINATION 2: 0.20 x DEAD LOADS
Representing, 10 and 20% of the dead load. Best regards,
Sebastian
RE: How to plot Vertical Displacement vs. Percent of Load Diagram?