INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Paving - 'leveling course' versus 'overlay'

Paving - 'leveling course' versus 'overlay'

Paving - 'leveling course' versus 'overlay'

(OP)
I am looking at a plan set where the entire roadway area (all very small local city owned roads in the southern US) is called out for a 'pavement overlay' of 1.5" of S-3 asphalt.  On this same plan set some areas are also called out to have a 'leveling course' applied. (with a 1.5" minimum thickness specified)  But since the entire area is to have the overlay applied, doesn't that make the leveling course part redundant?  Since all these roads are badly potholed and missing large surface sections won't the contractor by necessity have to apply a leveling course of some sort before applying the 1.5" overlay anyway?  I don't know much about paving so any thoughts would be helpful.

RE: Paving - 'leveling course' versus 'overlay'

Judging from the notation "S-3", you are in Florida.  A leveling course of a lower grade of asphalt is specified for two reasons....First, it usually has a slightly lower cost than the structural grade of asphalt.  Second, it forces the contractor to use a two lift approach, even if the overlay is relatively thin. If it were not specified this way, the contractor would try to level the existing asphalt and place the overlay at the same time, resulting in various thicknesses of the structural layer.  This would lead to variable compaction in the structural layer, so after traffic is on the pavement for a while, you would see depressions or rutting in these areas.

The specification is proper.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources