INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Relief well - allowable seepage velocity

Relief well - allowable seepage velocity

Relief well - allowable seepage velocity

(OP)
Hello forum members,
Can anyone help me or give me some tips on ways of estimating the maximum allowable seepage velocity of water (or maximum allowable flow) in relief wells placed on the downstream side of a dam ?

Any help or comments would be appreciated…
Regards

Patrick Saint-hilaire

RE: Relief well - allowable seepage velocity

Patrick,

Still interested in an opinion?

RE: Relief well - allowable seepage velocity

(OP)
Yes, I'm still interresed
Thank you

RE: Relief well - allowable seepage velocity

Patrick,

Well, better late than never.  Sorry, I was out of the country for awhile, away from anything resembling a computer.

Seepage velocities can be calculated for earthen retaining structures, up to and including the maximum velocity.  Above this maximum the risk of piping becomes signficant.  Are we dealing with an earthen dam?

The factor we can adjust in the calculation pertinent here is gradient.  Relief wells will induce a drawdown, and as such a gradient beneath the dam.

Is this the right direction for you?

RE: Relief well - allowable seepage velocity

halo...professional member...i have a question here....do anybody know what is the best way to reduce the force exert by the soil to the retaining wall?? i thinking to put some gravel particles there but it is not effcient to retain the soil...anybody got any brilliant, creative idea about it...do reply me as soon as possible....thanks..

RE: Relief well - allowable seepage velocity

Patrick -

Check out Seepage, Drainage & Flow Nets by Harry R. Cedergren - published by Wiley-Interscience.  If you "know" the pre-well flow and well discharges, then you have a good idea of how much is getting by -

RE: Relief well - allowable seepage velocity

Patrick,
Once a relief well is installed you should first perform sampling and testing to check if any internal erosion or piping is happening.  This is done by taking samples of the outflow and running lab analysis for solid particles charge.  Seepage velocities depend on the materials along the flow path.  You should instead use the monitoring data to determine the hydraulic conditions of the project.  Based on the data you would determine what safety precaution you need to take to prevent major damage or failure of the dam.

RE: Relief well - allowable seepage velocity

setthan:

Please start a new thread and post your question there.  And I'll look for it -

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources