Maximum pipe size before 2 welders should be used
Maximum pipe size before 2 welders should be used
(OP)
Do any North American codes state at what pipe size two welders should be utilized? Typically after 12" most clients that I have worked for recommend using two welders, however, I am not sure if this is actually in any of the codes. Please reference the code if it is.





RE: Maximum pipe size before 2 welders should be used
No, not with the Codes and Standards I deal with - ASME B&PV Code, Standards and the NBIC.
RE: Maximum pipe size before 2 welders should be used