INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

M.A.P.NC is Governed by a Flange !

M.A.P.NC is Governed by a Flange !

M.A.P.NC is Governed by a Flange !

(OP)
What should we do when MAPNC is governed by a standrad flange.
Why mawap or mapnc should not governed by flange and what should we do in that case?

Regards

RE: M.A.P.NC is Governed by a Flange !

rkdpv, your situation is not that uncommon, and unless a customer spec or something prohibits the flange limiting, there is no practical reason it can't. Something has to limit, after all.

If, on the other hand, it is not permitted to limit, and since is the N&C, you have few options. You can change the flange rating or the material.

Regards,

Mike

RE: M.A.P.NC is Governed by a Flange !

I don't recall ever seeing a spec in which the limiting component on MAP was restricted (note to self: check draft revision of spec on desk). MAWP restrictions - yes, as discussed extensively in previous threads (rkdpv - do some searching in this forum and forum292: ASME (mechanical) Code Issues for those threads).

I'd be curious as to what the difference in MAP is between the flange(s) and the next limiting non-standard flange component. Let's keep in mind that MAP is essentially used only for setting a hydrotest pressure.

Presuming that "standard flange" refers to an ASME B16.5 flange and that the vessel code is ASME VIII Div. 1, the hydrotest (adjusted for temperature...) is going to be 1.3*MAP. I would suspect that if you use the MAP of the next limiting component to set the hydrotest pressure, that pressure will still be below the 1.5*(flange rating) which is allowed for a B16.5 flange.

So... avoid an issue with the client and just set the hydrotest pressure based on the next limiting component. What percent increase in hydrotest pressure are we talking about anyway?

jt

RE: M.A.P.NC is Governed by a Flange !

(OP)
Thanks all..

Jt: thanks, good option, can we set hydrotest pressure based on the next limiting component? Is this permitted in ASME code?

Regards

RE: M.A.P.NC is Governed by a Flange !

ASME VIII does not place an upper limit on hydrotest pressure. You should, however, check on the stresses during hydrotest - as, depending on which Division, these may be limited. As long as you're below 1.5* flange rating, don't bother checking the flanges.

Can you confirm which code you are working to, and which flavor flanges you are using?

jt

RE: M.A.P.NC is Governed by a Flange !

(OP)
jt
I am using ASME sec. VIII div 1.
and flanges are standard ASME B 16.5.

Thanks

RE: M.A.P.NC is Governed by a Flange !

Hi everyone,
In my opinion if your limiting item is standard flange, then this will be MAWP of your vessel, IMHO.
For hydro-test pressure you have to calculate by the following formula: Pht=1.3 X Pmax70
where Pmax70 is max pressure of your flange at 70 degree F.
Please correct if I'm wrong.
Thank you,

Curtis
 

RE: M.A.P.NC is Governed by a Flange !

Curtis-

I believe you're confusing MAP and MAWP. Do you see anything technically wrong with the path I suggested above?

jt

RE: M.A.P.NC is Governed by a Flange !

curtis2004,

You forgot to include the temp correction factor for the reduction in allowable stress @ higher temps.

So you need to multiply 1.3*(Sa@RT/Sa@MAWT)*MAWP.NOTE: Use the lowest ratio for vessels constructed of multiple materials, so as to not overstress the weaker materials of construction. This causes the hydrotest pressure to remain the same or increase & stress the PV @ RT at the same levels as @ the MAWT. UG-99 (2)(b)

I do mostly Div2 & Div3 designs @ temps up to 1300°F & pressures up to 200,000 psig, but this should always be accounted for even though for most people the fraction =1 & doesn't make any difference.

 

RE: M.A.P.NC is Governed by a Flange !

Hi everyone,

In case of standard flange we do not have "S" but only "Pmax" at certain temperatures (It's already given maximum pressure flange can accept at diff. temperatures). I also had a flange limiting MAWP for a vessel. What I did is I used Pmax of flange as a MAWP. I calculated hydrotest pressure by multiplaying Pmax for a flange at 70 F. That is how I dealt with this issue.

Curtis

RE: M.A.P.NC is Governed by a Flange !

if you are using ug-99(c) to base your hydro you use
1.3 time map new & cold   (no need for the stress factor) as you have already used lower temp stress to figure map

if you are using a standard hydro  1.3 times mawp hot & corroded time   ( stress at room temp / stress at hot temp)

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources