INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Ventilation Duty Standby Seamless Changeover

Ventilation Duty Standby Seamless Changeover

Ventilation Duty Standby Seamless Changeover

(OP)
Hi,

I'm reviewing a specification for a vent control system upgrade and I'd be grateful for some advice.

The system has three fan sets operating duty/standby.  The first is for a cell extract.  The second for building extract.  The third is the air handling unit to supply conditioned air.  The system operates in a cascade such that if the cell extract has failed then the building and AHU will shutdown.  Start-up follows the same logic.  

My query is regard to seamless changeovers.  At the moment, if the cell extract Fan A were to fail (2oo3 voting) then the specification states that the AHU and Building extract will shutdown and then the cell Fan B will start.  Once the cell extract is re-established then the building extract will start and finally the AHU will kick in.

I'm a control engineer, but I'd like to think there would be a way to change-over the cell extract fans without shutting down the building and AHU fans.  Has anyone any experience with these type of cascade systems and is this the normal way to handle change-over operation?

Thanks in advance.

RE: Ventilation Duty Standby Seamless Changeover

Run both duty and stand by fans at reduced speeds to achieve the design air flow.If one fails the other fan can take over ramping upto full speed.

RE: Ventilation Duty Standby Seamless Changeover

(OP)
Thanks SAK9, I should've mentioned that the cell fans are configured for both dual fan operation and duty/standby.  I was just wondering if it's industry practice to have a seamless changeover on duty/standby vent systems.   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.