INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PEMB Erection Costs

PEMB Erection Costs

PEMB Erection Costs

(OP)
I am pulling together budget numbers for a proposed facility and I am trying to add a ballpark number for the erection costs of a PEMB. Suppliers have a tendency to spit out numbers like $5/SF, which seem a bit low. If anyone has a rule of thumb number I would greatly appreciate it.

Thanks in advance

RE: PEMB Erection Costs

Sometimes, all you have to do is ask them if that includes installation.  You're right, that number sounds low. If you have any finish requirements (like Kynar), insulation, doors, etc. that is probably not included.
And make sure you've included the foundation, slab, electrical, HVAC nad plumbing if they apply.

RE: PEMB Erection Costs

(OP)
Thanks Jed,

Maybe I should be a little more clear. I am more concerned with the steel erection, girts, purlins, and metal panels.
Plain ole storage shed with half wall heights therefore there are not any openings.Pretty much as simple as it gets. The other items I have already priced. I just can not get a good number for the erection that I am comfortable with.

Thanks again

RE: PEMB Erection Costs

I understand.  The PEMB supplier is the best one to get installation costs from.  You'd be surprised how many people get the costs from the PEMB abd think that's it.

RE: PEMB Erection Costs

I can confirm that $5/sf based on research I've done.

That is bare bones PEMB numbers for the building only and does not include costs for foundation construction/design, HVAC, light switches, toilets, you get the picture.
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources