How to clean a pipeline after a shutdown of the kiln?
How to clean a pipeline after a shutdown of the kiln?
(OP)
We have some issues when the slurry pipes are left full of this material and these pipes are not in use, then the material starts to settle and gets hard which makes unavailable these slurry pipes for using them again. We have had stops and delays in the kiln for this matter and these issues get worse when having low ambient temperatures and the slurry pipes freezes out.
The objective of the project is to come to a practical solution in order to ensure the reliability of these slurry systems, taking into account the maintenance, environmental and process impact for what ever the solution is going to be.
Thank you for the help!!





RE: How to clean a pipeline after a shutdown of the kiln?
You didn't say what size or length line you have. This can have a significant impact on the economic viability of options.
Have you looked at running a batching pig behind the last batch of slurry and pushing it with clean water? Then you only have to dump a pipe load of clean water (which is probably no longer clean after contacting the pipe walls).
In sizes smaller than 6-inch you can do the pigging/pig-removal with pigging valves that don't take much space at all.
David
RE: How to clean a pipeline after a shutdown of the kiln?
**********************
"The problem isn't finding the solution, its trying to get to the real question." BigInch
http://virtualpipeline.spaces.live.com/
RE: How to clean a pipeline after a shutdown of the kiln?
RE: How to clean a pipeline after a shutdown of the kiln?
Thanks again!