INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Stormwater Quality Calculations

Stormwater Quality Calculations

Stormwater Quality Calculations

(OP)
I am working with a few clients to develop a Stormwater Retrofit Plan.  We are trying to reduce phosphorous being discharged in a TMDL watershed.  One of the Retrofits being considered is the repair/rebuilding of roadside swales.  The problem is estimating the current phosphorous contribution from the swales.  A formula has been proposed to make this estimate.  However, the source of the formula is not known.  I was wondering if anyone has any information on the background of the formula.  This is a copy of the formula:

"The following calculations will be used to determine the amount of Phosphorous that is reduced at each site.  This calculation will be completed during the planning and design process to determine the current amount of Phosphorous.  The calculation will need to be completed before implementation as well as after in order to find the change in Phosphorous levels.  These calculations were developed by Westchester County and were approved for use by New York State Department of Environmental Conservation.  

Pload = (0.4536) ((R-1)(A)(L)(BD)(Ptest))/((RP)(1,000,000))

where:

Pload = TP Loading (kg/yr)

R       = enlargement ratio based on watershed impervious cover

A       = existing channel area (SQFT)

L       = channel or stream length(FT)

BD     = bulk density (LB/CF)

Ptest  = phosphorus level in soil (mg/kg)

RP     = relaxation period (years)

0.4536 and 1,000,000 are conversion factors

A and L are to be based on field survey
BD will be assumed to be 95 LB/CF based on typ soil conditions

RP is set at an assumed value of 67 years, based on channel enlargement theory

R is based on site impervious cover and channel enlargement empirical data

Ptest will use standard published values (recommend using 300 mg/kg)
 
R as a function of impervious cover is empirically derived to be:
y = 0.0012(x)(x) + 0.0239(x) + 1

where y is enlargement ratio, x is imperviousness (%)"

Any information on the source of this formula would be useful.

Thanks

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources