INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Deep Interceptor Sewer Project - Construction, Inspection, etc.
3

Deep Interceptor Sewer Project - Construction, Inspection, etc.

Deep Interceptor Sewer Project - Construction, Inspection, etc.

(OP)
Our project includes an extension of an interceptor sanitary sewer.  Pipe sizes range from 21-inch to 8-inch  ID.  The depth will vary between 10-feet and 34-feet, with a majority of the project over 20-feet.  I assume much of this will be open cut excavation (with double stacked trench boxes), however there will also be borings (bore & jack, steel casing pipe) at a few road crossings.  I am considering the use of PVC pipe for the entire project.  Backfiling and compaction will be a major task (clay soils).  Pipe and manholes will be televised, however only the pipe will be pressure tested.
If anyone has experienced a similar project I would appreciate any comments or suggestions, including:
Inspection of construction - how does the inspector see anything at the bottom of the deep excavation (such as placement and thickness of select bedding/cover material)?
Any problems with large diameter, deep, PVC pipe?
Should manholes be tested?  Pressure or vaccuum tested?
Anything else to watch-out for?
All comments appreciated!

RE: Deep Interceptor Sewer Project - Construction, Inspection, etc.

Depending on depth of bury, you might consider Hobas and HDPE lined RCP for larger diameters

RE: Deep Interceptor Sewer Project - Construction, Inspection, etc.

If the trench is properly shored and OSHA requirements are met, the inspector should be able to safely go down in the trench and inspect the trench and bedding and pipe isntallation.

21 inch is not that large of diameter, not sure why RCP would be necessary. there are other types of PE pipe that might be worth looking at besides lined RCP.

RE: Deep Interceptor Sewer Project - Construction, Inspection, etc.

Solid wall PVC and closed profile PVC pipe are also consider to be quality pipe.

RE: Deep Interceptor Sewer Project - Construction, Inspection, etc.

I did a lift station, which was over 20 feet deep, in Washington State ,and they wouldn't let us use a trench box.  The shoring had to be designed by a structural engineer and stamped.   

RE: Deep Interceptor Sewer Project - Construction, Inspection, etc.

Make sure the specs include a mandrel or deflection testing for the pipe.  The pressure test will tell if there are any leaks but not if the pipe is exceding allowable deflection. If those  

RE: Deep Interceptor Sewer Project - Construction, Inspection, etc.

All excavation at 20 feet need a P.E. to design the support system. If you used stacked trench shields without the P.E. stamp, you could get a fine from OSHA. Read the OSHA manual. Watch the pipe installation from the top and bottom. Watch the surveyors. Get all the daily logs from the contractor. If the trench is wet, watch closer. Get compaction reports from a THIRD party testing lab. Watch the compaction tests.

Richard A. Cornelius, P.E.
WWW.amlinereast.com

RE: Deep Interceptor Sewer Project - Construction, Inspection, etc.

While other materials might indeed work, I have seen some organizations insist on ductile iron pipe for some very deep sewers/tough conditions [there could thus be some at least local experience-based reasons for why folks over many years have gravitated, so to speak, to this predilection]  see e.g.  http://www.chattanooga.gov/Sanitary_Sewer_System_Design_and_Construction_Manual_Section_IV_11_pgs.pdf, http://www.ci.maryville.tn.us/wendy/Standard%20Drawing%20-%20sewer-%201of2.pdf, and http://www.troyalabama.com/Utilities/Sewer%20Department/Sewer%20Specs.%20Rev%201.doc etc.  

 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources