INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pressure Testing

Pressure Testing

Pressure Testing

(OP)
Can you advise if Pressure test requirments of tie in welds which shall be subject to UT & MPI. the manifold has been pre fabricatied and all welds have been x-rayed and pressure tested to 1.5 desgin pressure.

Question: is system subject to pressure test 1.5x desgin pressure or 1.1 ?

RE: Pressure Testing

i thought the test pressure was changed to 1.3X

RE: Pressure Testing

depends on which code your building to

RE: Pressure Testing

Eck75,

Pneumatic pressure test???
For pneumatic test you may consider 1.1 x design pressure...

RE: Pressure Testing

No, not for tie in welds. As long as a volumetric examination of the tie in welds is completed, there should be no need for a pressure test.

RE: Pressure Testing

Still Depends on Design Code

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources