INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

built up sections

built up sections

built up sections

(OP)
  what is the minimum distance between the flange butt weld
  and web butt weld according to awsd 1.1?

RE: built up sections

What is the detail?

I assume you are referring to a wide flange section.  Does the flange have a weld access hole?   

http://www.FerrellEngineering.com

RE: built up sections

Marten:
We need to understand the detail to answer your question.  Show us a sketch, with some dimensions, loading conditions, etc.

If it's really a built-up section, then you do the flanges and webs separately.  You can turn them, welding on alternate sides, to control the weld distortion.  After the first few passes on one side you can roll the piece, back gouge the original root, if full pen. is req'rd. and make a few passes on the second side.  Then go back to the first side for a few more passes.  The web or the flange will end up flatter this way.  You need run-out tabs at the two edges, but when you are done you can clean up the edges.

Then you fit the two flanges and the web together and do the fillet welds btwn. them.  Do each sides of the bot. flg. to the web; then flip the beam and do both sides of the top flg. to the web, and again alternate t&b if multi pass fillets are req'rd.  On large girders or heavy welds, I would weld on both sides of the web at the same time, again to control welding distortion; this will tend to keep the flange at 90° wrt the web.  This t&b alternating will minimize the camber (weld distorion) in your final beam.

If they are all good welds, designed for the conditions and stresses they'll see the exact location shouldn't really make much difference.  Obviously, you try not to make flange welds in max. moment regions, or web welds in max. shear areas.

RE: built up sections

I assume the original poster is asking about how far about the shop butt splices in the web plates and flange plates need to be.  There isn't a formal requirement; D1.1 clause 5.20 specifically says you can put them all in the same plane, though most people think that's a bad idea.  Our house specification calls for a 6" separation.

Hg

Eng-Tips policies:  FAQ731-376: Eng-Tips.com Forum Policies

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources