INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pum drains

Pum drains

Pum drains

(OP)
We have this pumps installed acording to API, but I am afraid the drains shown in the picture attached will break with the pumps vibration, any suggestions?

RE: Pum drains

"I am afraid the drains shown in the picture attached will break with the pumps vibration, any suggestions? "

Yes!  Find out why the pump is vibrating and fix it.

RE: Pum drains

(OP)
The pump is has not been started yet, we are finishing the project, I believe there will be some vibration...Thank you

RE: Pum drains

You need to have an "open drain"! This is where you place a drain hub (usually a reducer large end up) where it sticks above grade about 3" to 6". Then you direct your drain connections to be positioned about 2" to 3" above the "hub". So all you have to do is crack the valves at these locations, the discharge is then directed into the hub and then down in the drain header.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources