INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

Above Ground Flowlines

Above Ground Flowlines

(OP)
Dear Specialists:
Is there any body in this forum who has experience with Above Ground pipelines (continuously in contact with soil) modeling using Caesae software?

Thanks

RE: Above Ground Flowlines

(OP)
Good Morning every one;

Could someone indicate me where can I find specialists of stress analysis using Caesar ?

RE: Above Ground Flowlines

(OP)
Thanks Leonard;

I need your advice concerning modeling of above ground pipeline.

What is the best way to model above ground pipelines continuously in contact with soil? Is it by providing supports with short span or by using Buried modeler included in Caesar II.

In case we use Buried Modeler of Caesar II, what will be the Burial depth since the pipe is burried infact?  

RE: Above Ground Flowlines

You should check out the Caesar II forum at www.Coade.com. There is a good search facility and this question has been raised a number of times.  

RE: Above Ground Flowlines

(OP)
The question was raised by me on that forum, but no answer

Thank u

RE: Above Ground Flowlines

Johnrem,
        I thought LSThill would have responded by now as you asked him for more information and he could back up him extensive experience by helping you out.

RE: Above Ground Flowlines

(OP)
No body answered me until now...

RE: Above Ground Flowlines

Johnrem,
        Thought as much. So the CV posted was not much help then? You never actually get help from the poster - normally just a list of papers to refer to or a plug for FEpipe etc.

What I would do is model the system as a buried line with the lateral stiffness input as being equivalent to the friction between the pipe and the ground.You will have to come up with a figure dependant upon the "soil" the line is sitting on. The vertical stiffnesses - I would use a very stiff value for the downward values and as low as you can get away with for the upward resistance to movement. The axial resistance to movement - I would use the same as the lateral stiffness you come up with. The problem you have got is that if the stiffnesses used generates high compressive loads then the lateral restraint due to just the friction will not be enough to prevent lateral "buckling" of the line to the same extent as normally higher values used in buried lines. And the problem is you do not know where the pipe will move laterally in practice as slight imperfections in the straight routing of the line will become significant.

Sorry I can't help in any more detail but that's the way I would start to consider the problem.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close