INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pig Launcher/receiver interlocking logic

Pig Launcher/receiver interlocking logic

Pig Launcher/receiver interlocking logic

(OP)
I am currently working on logic for interlocking system for a pig launcher/receiver system in which we have a single barrel with two kickers one for launching and other for receiving with two block valves each and a balance line from barrel to launching kicker.

For launching of pig. I understand that we need to open the kicker valve on launching kicker followed by opening of balance line valve to pressurize both sides of pig and prevent the damage to valves on main line.

My question is do we need to close the balance line valve before opening the main line valves and throttling the bypass valve to effect launching of pig. Please see the attached layout for same.





 

RE: Pig Launcher/receiver interlocking logic

First, completely isolate and depressure the trap so that it is safe to open to insert the pig.  Once the pig is inserted, and the trap sealed up again, you would pressurize it.

When pressurizing the trap, you would open the balance line valve (V6) before opening the Launching Kicker Valve (V9) so that when you opened V9, you would simultaneously pressurize both sides of the pig.

What you do not want is a differential pressure acting across the pig.  If you open V9 first, you will pressurize behind the pig before you have opened the balance line and will have a differential pressure acting on it wanting to move it before you have opened the mainline valves.

Once the trap is fully pressurized, you would leave valves V6 and V9 open and then you would open Valves V1 and V2 (with the main bypass valve still open).  The pig should not move since you still have the flow bypassing the trap and the pressure is still equal both upstream and downstream of the pig.

Now that V1 and V2 are open, you would close the balance line V6. Following that, you would close the mainline bypass.  Now the only source of pressure is behind the pig and it will start to move.

Typically, the balance line is small relative to the kicker line and so I'm not sure it makes a big difference if this line is still open when you close the mainline bypass valve but the proper thing to do is close it after you have opened V1 and V2 but before you open the mainline bypass.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources