INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Batter Augercast Piles under Settling Embankment

Batter Augercast Piles under Settling Embankment

Batter Augercast Piles under Settling Embankment

(OP)
It is understood that an augercast pile installed at a batter beneath a recently constructed embankment that is causing long-term consolidation of the subsoils will develop moments along the pile shaft.  My question is if anyone is aware of any academic or research studies documenting this behavior and quantifying moment development at depth?      

RE: Batter Augercast Piles under Settling Embankment

See p. 1.16-2 in

http://www.state.nj.us/transportation/eng/documents/BDMM/pdf/bmsec16.pdf

that directs to

http://www.fhwa.dot.gov/engineering/geotech/library_arc.cfm?pub_number=42

Apart from that it occurs to me you could consider active push from the tall part and null passive resistance from a degraded downward's slope of the embankment. So, just the total active push of the upper part on all the piles if the piles are together enough, or of 3 times the diameter the width of each on the particular pile if sparsely populated. This was the approach taken by former spanish code for loads on buildings NBE AE-88.

RE: Batter Augercast Piles under Settling Embankment

As the embakment settles, any long batter pile will assume a sweep due to the settlement. The mooment in the pile is calculated based on the sweep of the pile. I would have two concerns with augecast piles in this situation : Augercast plies are often not reinforced to the full depth. (Sometimes they are) If they are not, tis could be a problem if the piles are deflected by soil setllement. The other problem is that auger cast piles can have sudden changes in profile which may cause stress concentrations during the bending. Hpiles are often used for batter piles. Pipe pile can also be battered fairly easily. Prestress can be battered, but the weight of the pile makes it a more complicated operation.

RE: Batter Augercast Piles under Settling Embankment

Draw a free body diagram of the soil movement vs. the pile geometry.  As DRC1 noted Augercast piles are not always reinforced to their full depth.  If reinforcement does not extend beyond the point of fixity for moment, then the pile can fail in bending.

RE: Batter Augercast Piles under Settling Embankment

My post was focusing more on vertical piles embedded in embankments than inclined ones spporting the embankments. Quite a miss, this time. Before finding your research items the best one can do is to model the thing in FEM, layers, contact and nonlinearity for the mid to longterm to a non-deformable layer, so typically better a task for someone dealing with soil's FEM frequently.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources