INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Crane Load Combos

Crane Load Combos

Crane Load Combos

(OP)
Ok, Ok, I know cranes have been a hot topic lately, but I think I've got something new to ask.

AISC design guide 7 Part 2 (the section about cranes) page 51 gives combos for 3 load cases in Section 13.7.  I've got questions about these.

Case 1 says dead should not be included yet it gives D in the combo. Am I missing something? If D isn't included why is it listed, and how can you not include D in some fashion?

Case 3 states "the total load of combined effects may be multiplied by 0.75." This seems comparable to the ASCE combon of D + 0.75(L+Lr+W), but surely they don't want 0.75 applied to D as well.  Also, they're using 1.0E instead of 0.7E.

Case 3 (4) could be written 0.75(D+L+Lr+Cd+E) based on the verbage, but I would think it would be more like
D+0.75(L+Lr+Cd+0.7E).

RE: Crane Load Combos

In Case 1 it sounds like AISC is disagreeing with AISE on the inclusion of D.

I think in the other cases they may be allowing the user to use the 0.75 factor on the total combined effect because of how extreme the combinations already are.

for example in Case 3.1

full Dead + Full Live + Full snow + Full vertical crane (crane weight + hooked load) + Crane impact + Wind.

This would amount to Armegeddon.
 

RE: Crane Load Combos

(OP)
My thoughts too.

I'll throw the 0.75 on everything else, but not D.  and I'm also using 0.7E so it boils down to 0.525E in the end.

1.0Dead + 0.75Live + 0.75Snow + 0.75Crane + (0.525Quake or 0.7Wind)

RE: Crane Load Combos

As with any load combinations that are code prescribed, they are minimums. You are free to use what you like in excess of the code...as long as the owner is happy.

My experience with combining crane loads with building loads is that they can get extremely hairy if you try to use a wholesale approach. I have blindly included all of the wind, live, dead & snow with crane loads on stepped crane columns and wound up with literally hundred of combinations.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources