INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

permanent tie-back for slurry wall/basin wall

permanent tie-back for slurry wall/basin wall

permanent tie-back for slurry wall/basin wall

(OP)
This question is two folds:

1. Are you aware of such construction (permanet tie-back for slurry wall/basin wall) for a liquid containing basins? good or bad?

2. As this tie-back appears part of the permanent structure, how engineer monitor its corrosion and creep/relaxation over the years? manual datalog or a SCADA-alike automact live monitoring?

Many thanks

RE: permanent tie-back for slurry wall/basin wall

I don't see why you couldn't put a liquid in a slurry wall excavation, provided that it is properly lined.  If the liquid bears directly against the wall, it will only help reduce pressures.  If the liquid is in a secondary container, isolating it from the wall, then it's no different from any old slurry walled excavation.

As far as the installation of permanent load cells, I don't see any reason why you couldn't install some automated data retrieval system.  Talk to an instrumentation company about this, and they'll probably give you some recommendations as to what you can and can't do.

Make sure you spec out that anchorheads have the capability of being restressed and that they will be accessible through whatever waterproofing is put in.

Have you explored circular retaining walls?  You may be able to forgo tiebacks all together, depending on geometry and soil, etc.

RE: permanent tie-back for slurry wall/basin wall

I don't see why you couldn't put a liquid in a slurry wall excavation, provided that it is properly lined.  If the liquid bears directly against the wall, it will only help reduce pressures.  If the liquid is in a secondary container, isolating it from the wall, then it's no different from any old slurry walled excavation.

As far as the installation of permanent load cells, I don't see any reason why you couldn't install some automated data retrieval system.  Talk to an instrumentation company about this, and they'll probably give you some recommendations as to what you can and can't do.

Make sure you spec out that anchorheads have the capability of being restressed and that they will be accessible through whatever waterproofing is put in.

RE: permanent tie-back for slurry wall/basin wall

Please don't post the same question to multiple forums.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources